| Design report (final issue) | 40 to 80 hours per report | 8 to 12 hours | Claude reads design notes, calc files, prior similar reports, relevant AS / NZS excerpts. Drafts the report in your house format. CPEng verifies every finding and signs. |
| Engineering tender response | 20 to 40 hours per tender | 4 to 6 hours | Claude reads RFP / RFT, your capability library, prior winning tenders. Drafts the response with methodology, team, fee approach. Lead engineer and bid manager finalise. |
| Peer-review response (client or internal) | 8 to 16 hours per round | 90 min to 2 hours | Claude reads original report, peer comments, supporting calcs. Drafts response to each comment with engineering substantiation. Lead engineer verifies and signs. |
| Design-development report (early-stage) | 20 to 40 hours per stage | 4 to 6 hours | Claude drafts the DD report from design-team notes and options analysis. Senior engineer owns the design direction; Claude documents it. |
| Specification (technical spec) | 20 to 60 hours per package | 4 to 8 hours | Claude reads design intent, prior specifications, AS / NZS references. Drafts the spec in your house format. Lead engineer verifies critical requirements. |
| RFI response (technical, mid-construction) | 90 min to 3 hours per RFI | 15 to 30 min | Claude reads RFI, design documents, calc notes, prior similar RFIs. Drafts the response. Senior engineer verifies and signs. |
| Certification letter (regulator / client) | 90 min to 3 hours per letter | 30 to 45 min | Claude drafts the certification letter from the underlying engineering position. CPEng reviews substantively against their own judgement, signs based on their certification. |
| Monthly project status report | 4 to 8 hours per project per month | 30 to 60 min | Claude reads month's design progress, RFI log, design changes, programme status. Drafts the report in your house format. Project lead sharpens commercial framing. |